Aikan - Performance
The Aikan system has been tested and evaluated due to the operation of the plants in both Denmark since 2003 and Norway since 2005.
The experiences have resulted in general facts and perspectives about the system. Read about these in the pages shown in the left menu. |
|
|
|
|